Studio Build Chapter: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11
Warm weather is back and I can start finishing the outside of the building. This involves vinyl siding and a little final work on the site and driveway. After this work was done, I was able to get my final building inspection done. We passed with flying colours!
Siding is nice work. I haven’t worked too much with vinyl, but my dad brought along a friend named O’Ryan who had quite a bit of experience. He got us going and showed me a few tricks. We got quite a bit done that first day, and me and dad were able to finish it on our own after that. I had good help!
Click on any thumbnail to start a slideshow
Studio Build Chapter: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11