Studio Build 5 – Tape, Paint, Electrical

Studio Build Chapter: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11

Getting close to the home stretch now, but still a couple major things to do. The taping (plastering) is next and it’s a big job I am incapable of doing. Fortunately, my cousin Roger (who helped with framing) is also a master taper with years of experience. He very generously offered to do the taping and finishing for me.

Paint and electrical were my jobs, and once Roger was done and a final good clean-up done, I had lots to keep me busy for the next several evenings and a couple of weekends. That mini-scaffolding was a god-send!

Click on any thumbnail to start a slideshow

Studio Build Chapter: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11